WARD MANUFACTURING :: WARD FITTINGS :: WARDFLEX :: WISCONSIN NIPPLE
Stimulus Act Requirements



    The installation of WARDFLEX flexible gas piping must be performed by a qualified installer who has successfully completed the WARDFLEX training program. These training classes are held on a regular basis at nearby WARDFLEX distributors or can be scheduled at an individual contractor's place of business.

    After completing the WARDFLEX training course, the installer must also meet all qualifications required by the state and/or local administrative authority administering the provisions of the code where the WARDFLEX gas piping is installed.


     Contact Us | Email Us | Download Acrobat Reader | Ward Manufacturing | © Copyright 2007 Ward Manufacturing Company